Refurbishment Of The Level
Revisiting works carried out back in 2012, a second refurbishment of the diminutive wayside halt at The Level was carried out in 2021 by Association volunteers, the main change being the replacement of traditional green colour scheme with a dark maroon appearance; this was considered to be more appropriate and make the building stand out in a backdrop surrounded with trees and greenery. The finishing touch was a new bilingual running in board provided by Sneaky Weasel.
Quiet Time Between Trains
July 2022
Crossing Lodge With Flower Pots
August 2022