Refurbishment Of The Level

Revisiting works carried out back in 2012, a second refurbishment of the diminutive wayside halt at The Level was carried out in 2021 by Association volunteers, the main change being the replacement of traditional green colour scheme with a dark maroon appearance; this was considered to be more appropriate and make the building stand out in a backdrop surrounded with trees and greenery.  The finishing touch was a new bilingual running in board provided by Sneaky Weasel.

Quiet Time Between Trains

July 2022

Following Association Renovations

July 2022

Association Floral Displays

July 2022

Crossing Lodge With Flower Pots

August 2022